hartford-ct

Rethinking and Recalibrating Design-Build

In the last 18 months, the signs and signals, if not alarms, that something is seriously veering off the tracks in Design-Build (“DB”) delivery on major public infrastructure projects have become increasingly evident by comments and actions of a number of diverse and important constituencies in the construction, design and insurance industries. The root causes of many of the negative experiences and trends on those DB projects arise out of certain Owner procurement and contractual practices that are adversely, albeit differentially, impacting Contractors, Consulting Engineers and their professional liability insurers; and resulting in their (suspended or permanent) withdrawal from DB projects…

[fusion_button link=”https://dbiane.org/wp-content/uploads/2021/01/DH_Rethinking-and-Recalibrating-Design-Build_December2020.pdf” text_transform=”” title=”” target=”_blank” link_attributes=”” alignment_medium=”” alignment_small=”” alignment=”” modal=”” hide_on_mobile=”small-visibility,medium-visibility,large-visibility” sticky_display=”normal,sticky” class=”” id=”” color=”default” button_gradient_top_color=”” button_gradient_bottom_color=”” button_gradient_top_color_hover=”” button_gradient_bottom_color_hover=”” accent_color=”” accent_hover_color=”” type=”” bevel_color=”” border_width=”” border_radius=”” border_color=”” border_hover_color=”” size=”” stretch=”default” margin_top=”” margin_right=”” margin_bottom=”” margin_left=”” icon=”” icon_position=”left” icon_divider=”no” animation_type=”” animation_direction=”left” animation_speed=”0.3″ animation_offset=””]Download the PDF[/fusion_button]

Leave a Comment

You must be logged in to post a comment.